Qontiv
APIyesOSS—FREE—DOCS4/5
QO6.7#10 of 27
outWeboutWindows—MacoutLinux—Android—iOS
Ranked in Document Control Software ·No free plan on record· paid from $1,000/mo
About
Qontiv is ranked #10 of 27 in document control software on Inferse. It runs on API, Linux, Web, Windows. There is no free plan. Paid plans start at $1,000/mo.
Compared on document control software
- Free plan
- Noqontiv.com
- Revision history
- Yesqontiv.com
- Approval workflows
- Yesqontiv.com
- Audit trail
- Yesqontiv.com
- Electronic signatures
- Noqontiv.com
- Role-based access
- Yesqontiv.com
- Document expiry controls
- Yesqontiv.com
Facts
- Product
- Qontiv describes itself as a cloud MES for regulated discrete manufacturers, combining production execution and quality engineering.qontiv.com · 4 Oct 2026
- OEE
- It calculates Availability, Performance, and Quality from machine signals and provides downtime reasons, shift trends, Pareto analysis, and Six Big Losses breakdowns.qontiv.com · 4 Oct 2026
- Work instructions
- Electronic work instructions provide step-by-step operator guidance with measurement inputs, e-signatures, and photo evidence.qontiv.com · 4 Oct 2026
- Machine connectivity
- The edge gateway connects to machines via OPC-UA and MQTT, and the site says a first machine can be online in under two hours without middleware.qontiv.com · 4 Oct 2026
- Scheduling
- Production scheduling includes a drag-and-drop Gantt scheduler with equipment utilization visibility and constraint-aware sequencing.qontiv.com · 4 Oct 2026
- AI Copilot
- The AI Copilot answers questions about production data in plain language and surfaces issues through anomaly detection.qontiv.com · 4 Oct 2026
- Integrations
- Listed integrations include Oracle EBS and Oracle Fusion Cloud Manufacturing with import and write-back, NetSuite SuiteTalk and SAP S/4HANA Cloud with import only, and MaintainX with bidirectional sync.qontiv.com · 4 Oct 2026
- Integration limits
- NetSuite and SAP connectors do not write back, MaintainX does not sync meter readings, work requests, or asset hierarchy and location data, and no PLM connector currently ships.qontiv.com · 4 Oct 2026
- Developer access
- The REST API, webhooks, and SDKs are available on every tier; the documented SDKs are for C#, Python, and TypeScript.qontiv.com · 4 Oct 2026
- Security and compliance
- Qontiv says it is not certified to standards on behalf of customers and does not currently hold SOC 2 Type II or ISO/IEC 27001:2022 certification.docs.qontiv.com · 4 Oct 2026
- Security controls
- The regulatory compatibility page lists tenant isolation using PostgreSQL row-level security, audit logging, and tenant-configurable MFA enforcement.docs.qontiv.com · 4 Oct 2026
- Evaluation
- There is no free trial or self-signup; evaluation is a paid four-week pilot whose fee is credited in full against a first annual contract.qontiv.com · 4 Oct 2026
- Who it serves
- The site identifies automotive, aerospace, medical-device, and battery or energy-storage manufacturers as industries it serves.qontiv.com · 4 Oct 2026
- Company stage
- Qontiv says it is in a design-partner phase and is pre-production.qontiv.com · 4 Oct 2026
- Production features
- The product includes OEE tracking, electronic work instructions, SPC, production scheduling, maintenance management, inventory and lot or serial genealogy, and dashboards.qontiv.com · 5 Oct 2026
- Electronic instructions
- Electronic work instructions provide step-by-step operator guidance with measurement inputs, e-signatures, and photo evidence.qontiv.com · 5 Oct 2026
- Security
- The Trust Center states that data is encrypted in transit with TLS 1.3 and at rest with AES-256, and tenant row-level security is enforced at the PostgreSQL layer.qontiv.com · 5 Oct 2026
- Compliance status
- Qontiv says SOC 2 Type II, ISO/IEC 27001:2022, and ISO/IEC 42001:2023 certifications are on its roadmap and are not currently held.qontiv.com · 5 Oct 2026
- Audit records
- The Trust Center says regulated records are append-only at the database level and electronic signatures are immutably bound to the record, user identity, timestamp, and declared meaning.qontiv.com · 5 Oct 2026
- Support
- Core includes email support with a 24-hour response, while Professional includes priority support with a 4-hour response.qontiv.com · 5 Oct 2026
- Intended users
- Qontiv says it is built for discrete manufacturing today; native batch-record management and continuous-process recording are on the roadmap but not yet available.qontiv.com · 5 Oct 2026
- Company
- The site identifies the company as Qontiv, Inc. and describes a pre-production phase with early customers helping shape the product.qontiv.com · 5 Oct 2026
- ERP and CMMS integrations
- Shipped connectors include Oracle EBS and Oracle Fusion with import and write-back, NetSuite and SAP S/4HANA Cloud with import only, and MaintainX with bidirectional sync.qontiv.com · 5 Oct 2026
- API
- The REST API, webhooks, and SDKs are available on every tier; Qontiv states Core includes 100,000 API calls/month, Professional 1,000,000, and Enterprise unlimited.qontiv.com · 5 Oct 2026
- Certifications
- Qontiv says it does not currently hold SOC 2 Type II, ISO/IEC 27001:2022, or ISO/IEC 42001:2023 certifications; each is on its roadmap.qontiv.com · 5 Oct 2026
- Pilot and implementation
- The maker offers a 4-week pilot for $10,000 fixed, credited against a first annual contract signed within 90 days of the go/no-go review; implementation and guided data modeling start at $15,000.qontiv.com · 5 Oct 2026
- Intended customer
- Qontiv says it is built for discrete manufacturing today; native batch-record management, ISA-88 recipe control, time-based continuous-process recording, and yield-from-recipe calculations are not yet available.qontiv.com · 5 Oct 2026
Best Qontiv alternatives
See all 20Where it ranks on Inferse
Sources
- qontiv.com· checked 4 Oct 2026
- qontiv.com/product/integrations/· checked 4 Oct 2026
- qontiv.com/developers/· checked 4 Oct 2026
- docs.qontiv.com/latest/admin/regulatory-compatibility/· checked 4 Oct 2026
- qontiv.com/why-qontiv/· checked 4 Oct 2026
- qontiv.com/about/· checked 4 Oct 2026
- qontiv.com/trust/· checked 5 Oct 2026
- qontiv.com/pricing/· checked 5 Oct 2026
